(The Canadian Press)

Chinese companies commit to Canadian oilsands despite setbacks, poor operating results

European and U.S. companies have cut back

While some European and U.S. companies cut their exposure to the Canadian oilsands, China’s Big Three oil giants — CNOOC, PetroChina and Sinopec — seem content to let their bets ride even if the results haven’t been spectacular.

In 2018, PetroChina produced an average of just 7,300 barrels per day of bitumen from its MacKay River thermal oilsands project, although it was designed to produce 35,000 bpd. In June, its output was about 8,700 bpd.

The Beijing-based company paid $1.9 billion in 2009 for 60 per cent interests in the proposed MacKay River and Dover oilsands projects being developed by Athabasca Oil Sands Corp. (now just Athabasca Oil Corp.), then bought out the rest of MacKay for $680 million in 2012 and Dover for $1.2 billion in 2014.

“MacKay River is located in an area with complex geology, which creates challenges to heat up the reservoir to get the bitumen flowing,” said spokesman Davis Sheremata in an emailed statement.

The company is drilling new wells and experimenting with various technologies to boost output, he said, adding a go-ahead for Dover has been put on hold until MacKay proves itself.

Still, “PetroChina Canada is committed to Canada for the long-term, having maintained its investments through economically challenging times.”

CNOOC produced about 71,000 bpd from the oilsands in 2018, little changed from 66,800 bpd in 2014, shortly after it spent $15.1 billion to buy Calgary’s Nexen Energy and its diverse portfolio of domestic and international assets.

“Our oilsands assets are an important part of our North American portfolio and we remain committed to our Canadian operations,” CNOOC spokesman Kyle Glennie wrote in a brief email.

Meanwhile, Sinopec paid $4.65 billion to buy a nine per cent stake in the Syncrude oilsands mining consortium from ConocoPhillips in 2010 and its resulting production has been steady since, registering just over 27,000 bpd in 2018.

The Chinese energy majors employ “patient capital” and it seems unlikely they will leave the oilsands anytime soon, said Jia Wang, deputy director of the China Institute at the University of Alberta.

“The assets they bought may not be the most profitable or may require more capital intensive development. … (but) these are large Chinese companies, they’re not likely to become bankrupt,” she said.

“They have been through thick and thin, and different cycles of boom and bust. These (oilsands) operations in the grand scheme of these massive companies are not the largest chunk of their business so they can afford to have a presence here without incurring too much loss.”

READ MORE: ‘Making this up:’ Study says oilsands assessments marred by weak science

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Deaths on popular Shuswap trail ruled accidental

B.C. Coroners Service reports on fatal falls in May and July 2019

Update: Highway 1 between Salmon Arm and Sicamous partially reopens

Westbound traffic delayed as crews recover a vehicle

UPDATE: Protesters say they will maintain blockade near Chase “as long as it takes”

Goal is to see RCMP removed from Wet’suwet’en territory

Potholes plentiful in Salmon Arm’s industrial park

City says patching effort underway, residents can report potholes on city’s website

Shuswap housing too expensive? Neighbourhood crime a concern? Input wanted

Survey asks CSRD residents to weigh in on the affordability and availability of housing in the area.

Swinging with the Stars: Team Crimson

Swinging with the Stars raises funds for the Central Okanagan Hospice Association

Study says flu vaccine protected most people during unusual influenza season

Test-negative method was pioneered by the BC Centre for Disease Control in 2004

Saskatchewan and B.C. reach championship round at Scotties

British Columbia’s Corryn Brown locked up the last berth in Pool B

‘Chain reaction pile up’ closes southbound traffic on Coquihalla Highway

Black Press Media has reached out to RCMP, paramedics for details

Federal minister to speak in North Okanagan

Greater Vernon Chamber welcomes middle class prosperity minister to talk money

B.C. lawyer, professor look to piloting a mental-health court

In November, Nova Scotia’s mental-health court program marked 10 years of existence

EDITORIAL: Thoughtless posts to Facebook cause real harm and stress

At the risk of resembling a broken record, it needs to be… Continue reading

COLUMN: Not an expert on First Nations government structures? Then maybe you should calm down

Consider your knowledge about First Nations governance structures before getting really, really mad

Meet the Wet’suwet’en who want the Coastal GasLink pipeline

Supporters of the pipeline are upset only one side is being heard nationwide

Most Read