August 4, 2019 will mark the fifth anniversary of the Mount Polley Mine breach. A delegation lead by Amnesty International will travel to Mitchell Bay on Quesnel Lake on the weekend to deliver hundreds of messages of solidarity from all over Canada to people affected by the 2014 mining disaster.

August 4, 2019 will mark the fifth anniversary of the Mount Polley Mine breach. A delegation lead by Amnesty International will travel to Mitchell Bay on Quesnel Lake on the weekend to deliver hundreds of messages of solidarity from all over Canada to people affected by the 2014 mining disaster.

Anger, betrayal still felt five years after Mount Polley Mine breach in northern B.C.

“We just don’t want to drink the water knowing Mount Polley’s still dumping their crap in there.”

Angry, disappointed, betrayed — those are some of the words Quesnel Lake resident Doug Watt uses to described how he still feels as the five-year anniversary of the Mount Polley Mine breach approaches this weekend.

Watt lives on the lake near Cedar Point Park downstream of the Aug. 4, 2014 dam breach disaster, which released upwards of 25 million cubic metres of mine waste and water into Quesnel Lake and Quesnel River.

Watt said he was asleep that fateful morning when firefighters called and alerted him to the unfolding emergency. The campgrounds nearby were full with campers for the long weekend, and everyone was rushing to pack up and leave because of possible flooding or a log jam at the Likely bridge.

In the years since, the communities and businesses on the lake have tried to recover from the breach, which is considered one of the biggest mining disasters in Canadian history. Mount Polley Mine eventually received approval to go back to work. It also completed several years of remediation work to Hazeltine Creek and the surrounding area.

READ MORE: Mount Polley continues remediation and monitoring as fifth year after the breach unfolds

Last year, the union representing some of the workers took the company to court for not giving enough advanced notice of job layoffs, at which point the mine revealed they were under pressure because of mounting financial losses. In April 2019, the mine closed indefinitely.

Watt said the experience was and continues to be a difficult one, and disappointing.

“Generally it’s been very stressful,” he said, noting he doesn’t trust the company or government when it comes to protecting the lake.

Specifically, Watt is furious that after the breach, the mine was granted a permit to pipe wastewater into the lake in front of Hazeltine Creek in April 2017.

“You look at what this lake was before — it was pristine. They are continuing to insult us by adding their effluent.”

READ MORE: Mount Polley Mine’s sampling of Quesnel Lake questioned by local resident

Watt said the company is supposed to stop discharging from the pipeline Dec. 31, 2022 once they come up with a water plan, but he said he’s seen plans that show the pipeline still discharging into the lake in 2025.

“We believe their whole plan is to never take that (pipeline) out of the lake.”

In the months and years since the breach, he said residents have seen the once-crystal clear lake waters turn cloudy periodically as it continues to flush the slurry, as well as algae blooms, and that guides say the insect hatches are not the same as they used to be on Quesnel River.

The government has deemed the lake water safe to drink, but Watt said he and his family no longer drink from it.

“We just don’t want to drink the water knowing Mount Polley’s still dumping their crap in there.”

Watt is a member of the public liaison committee that meets throughout the year with Mount Polley Mine officials who are required to provide updates and answer questions.

He is also a member of the Concerned Citizens of Quesnel Lake, founded by Christine McLean, who are fighting to stop the pipeline through B.C.’s Environmental Appeal Board.

To date, the mine and its parent company, Imperial Metals, have not been charged or fined in the 2014 breach, although Watt confirmed officers were in the area a few months ago asking questions relating to an investigation.

The Public Prosecution Service of Canada declined to confirm with the Tribune whether charges have been forwarded.

On Saturday, Amnesty International Canada will be arriving at Mitchell Bay near Hazeltine Creek on Quesnel Lake from Vancouver Island to share solidarity messages, record interviews and be a part of an anniversary gathering hosted by McLean.

READ MORE: B.C.’s Mount Polley Mine to suspend operations

McLean will also be giving a presentation and report on the work her group has been doing, with an update on their appeal.

Meanwhile, disciplinary hearings are being scheduled for engineers Todd Martin, Stephen Rice and Laura Fidel in relation to the breach under the regulating authority, Engineers and Geoscientists BC.

Martin’s hearing is scheduled for May 4-8 and May 11-15, 2020. Dates for Rice and Fidel are to be determined.


Do you have a comment about this story? email:
editor@wltribune.com

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

Doug Watt still lives on Quesnel Lake. (photo submitted)

Doug Watt still lives on Quesnel Lake. (photo submitted)

Just Posted

Scotch Creek residents on the Saratoga water system will be without water for most of April 14 as the Columbia Shuswap Regional works on water system upgrades. (File photo)
Water system shutdown planned for Scotch Creek

Residents on Saratoga system encouraged to store water in case shutdown is longer than expected

Developer Bill Laird has applied to the city to have the two-acre parcel (outlined in yellow) behind the Westgate Mall, which is already out of the Agricultural Land Reserve, ready for development by having it included within the city’s Urban Containment Boundary and redesignated in the official community plan. (City of Salmon Arm image)
Plan to prepare field behind Westgate Mall for development gets initial OK

Proposal to expand urban containment boundary forwarded to council’s April 12 meeting

Mainly clear and sunny skies are expected for the Okanagan-Shuswap region this week. (Maxpixels photo)
Warm, sunny week ahead in Okanagan-Shuswap

Daytime highs will reach the low 20s with mainly clear skies this week

Janice Cannon, right, of Little Red Hen Artisan Bakery boxes up a selection of items for a customer at last year’s Downtown Salmon Arm Farmer’s Market. The Salmon Arm bakery is returning for this year’s market. (File photo)
Young vendors sought for Downtown Salmon Arm Farmer’s Market opening

Shuswap Food Action Society seeking small appliances, kitchenware for SAFE Society

A Salmon Arm artist worked with talented local fabricators to create an enormous set of steel bighorn sheep horns to greet visitors to Radium Hot Springs. (Village of Radium Hot Springs image)
Salmon Arm locals’ skills bring steel sheep horn sculpture to Radium

Adam Meikle and Idea 64 Projects made the towering horns a reality

People take part in an anti-curfew protest in Montreal on Sunday April 11, 2021. Hundreds of people gathered in Old Montreal tonight in defiance of a new 8 p.m. curfew. THE CANADIAN PRESS/Giuseppe Valiante
VIDEO: Hundreds defy Montreal’s 8 p.m. curfew in violent, destructive protest

Quebec reported 1,535 new COVID-19 cases on Sunday, as well as five additional deaths linked to the virus

Interior Health improves access to mental health supports amid COVID-19 pandemic. (Stock)
Interior Health connects people to mental health resources amid COVID

310-MHSU line receives positive feedback in early months of rollout

Construction has begun on Phase 4 of the Kicking Horse Canyon Project, with lengthy closures on the way. (Claire Palmer photo)
Construction has begun on Phase 4 of the Kicking Horse Canyon Project, with lengthy closures planned for the next four weeks. (Claire Palmer photo)
24-hour Trans-Canada closures begin east of Golden

It’s the final phase of the Kicking Horse Canyon construction project, which is realigning and widneing the higwya

A volunteer disinfects a historical Mohabat Khan mosque ahead of the upcoming Muslim fasting month of Ramadan, in Peshawar, Pakistan, Friday, April 9, 2021. (AP Photo/Muhammad Sajjad)
For Canadian Muslims, second pandemic Ramadan is a time of hope and sadness

Many members of the association are trying to find ways ‘to help people stay connected to one another’

The Okanagan Symphony Orchestra performed Exsultate, a live-streamed all-Mozart concert, on April 10. (Contributed)
REVIEW: Okanagan Symphony Orchestra exalts in Mozart

Live-streamed, all-Mozart concert was held on April 10

South Surrey farmland, March 2020. The province’s crackdown on secondary residences sparked protests that have the NDP government engaged in a lengthy rewrite of its legislation. (Tracy Holmes/Peace Arch News)
B.C. NDP now wants to keep even ‘non-farmers’ on the land

‘Grandfathering’ of second residences extended again

Clarence Fulton is the latest in six Vernon schools to have COVID-19 exposures. (Jennifer Smith - Morning Star)
COVID-19 exposures at six Vernon schools

List has grown over the last week, sending more students home for self-isolation

RCMP did not commit offense in arrest which seriously injured Lake Country man, finds IIO. (Phil McLachlan/Capital News/Stock)
No criminality suspected in sudden death in Vernon

Police responded to reports of a body near an Anderson Way business Sunday

Photos of Vancouver Canucks players are pictured outside the closed box office of Rogers Arena in downtown Vancouver Thursday, April 8, 2021. The Vancouver Canucks say 25 players and coaches have tested positive during a COVID-19 outbreak that involves a variant of the virus. It is now the biggest reported outbreak in the NHL this season. THE CANADIAN PRESS/Jonathan Hayward
Canucks’ return to practice pushed back as player added to COVID protocol list

COVID outbreak has led to eight games being cancelled

Most Read