- Credit: Facebook

New maintenance crew to look after Okanagan Connector

Acciona Infrastructure Maintenance Inc. will replace Argo Road Maintenance Inc. in 2019

A new road maintenance company will be looking after the Okanagan Connector in 2019.

Argo Road Maintenance Inc. is the existing contractor for the South Okanagan as the current agreement runs until April 30, 2019. The new contract for this area has been awarded to Acciona Infrastructure Maintenance Inc. from Spain through an open bidding process. This agreement begins on May 1, 2019, according to a statement issued by the Ministry of Transportation.

READ MORE: Snowfall warning for Okanagan Connector

Acciona will maintain the portion of the Okanagan Connector (Highway 97C) from Peachland to the Pennask Summit that Argo is currently maintaining.

Twenty six of the 28 maintenance contracts in the province are being tendered and awarded in 2018 and 2019 through an open bidding process. The new maintenance contract requires even higher standards and a more proactive approach when a winter weather event occurs, the statement said.

Improvements to the contract include:

* Increased communication with the public about rapidly changing road conditions during severe weather events and other incidents affecting travel on B.C. roads.

* Return Class A highways to bare pavement within 24 hours of a winter weather event ending at pavement temperatures of -9 C or warmer, when de-icing chemical use is safe and effective. The previous standard was 48 hours.

* Increase patrol frequency to 90 minutes on a Class A highway, like the Coquihalla, during a winter storm. The previous standard was four hours.

* When a weather event is forecasted to occur, increase the patrol frequency to four hours. The previous standard was 24 hours.


edit@kelownacapnews.com

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

United Way celebrates seven decades of impact in Southern Interior

Organization sees issues with poverty, mental health and addictions, heighten during the pandemic

Two new COVID-19 cases reported in Interior Health

The total number of Interior Health cases since the beginning of the pandemic is now at 522

Sicamous mayor hopeful Highway 1 bridge replacement remains a priority after election

Construction of Bruhn Bridge replacement was initially to commence in 2020

Heating, flooring, other projects prepare Shuswap schools for reopening

School District #83 staff comfortable with work done at Parkview to address moisture issues

Shuswap golfer’s hole-in-one earns bragging rights and $500

Glenn Ford aces hole at Shuswap Lake Estates sponsored by Copper Island Fine Homes

B.C. records 98 more COVID-19 cases, most in Lower Mainland

One new senior home outbreak, Surrey Memorial outbreak over

Kelowna man injured during arrest sues RCMP

Supreme Court civil claim alleges Dustin Blondin was the victim of an ‘unprovoked attack’

PHOTOS: 2nd calf in a month confirmed among Southern Resident killer whale pod

Center for Whale Research said they will eagerly await to observe the calf to evaluate its health

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Parks Canada not responsible for Mount Kobau blockade

Nearby residents have been vocal about plans to turn the area into a national park

97 distressed horses, cats and dogs seized from farm in Princeton

RCMP assisted as BC SPCA executed search warrant

$250K reward offered as investigation continues into Sea to Sky Gondola vandalism

Police also asking for specific footage of Sea to Sky highway around time of incident

Trudeau ‘disappointed’ by RCMP treatment of Sikh officers over mask issue

World Sikh Organization of Canada said taking Sikh officers off the front lines constitutes discrimination

Liberals reach deal with NDP on COVID-19 aid bill, likely averting election

NDP and the Liberals have reached an agreement on COVID-19 sick-leave

Most Read