A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

VIDEO: New Sicamous Highway 1 bridge renderings show one less lane than promised

Mayor Terry Rysz wants to see access improvements and funding for a pedestrian bridge.

According to a recent update, the replacement for the RW Bruhn Bridge along Highway 1 won’t be the five-lane structure previously chosen by the province after much public consultation.

Following a series of engagement opportunities with Sicamous residents, including a survey, open houses and a town hall meeting, through which the public provided input on three replacement options, the Ministry of Transportation and Infrastructure announced in 2018 that the existing bridge would be replaced by a five-lane span.

Sicamous Mayor Terry Rysz was a vocal proponent for one of the other options that included a four-lane highway bridge accompanied by a smaller one at Main Street. The plan with the Main Street bridge was endorsed by the Sicamous council at the time.

Though the project is currently in the detailed design phase, recent information released by the ministry, including videos and a Winter 2021 update, shows a four-lane structure – without the second bridge at Main Street.

A ministry representative said the most recent design was selected because it will allow for the closure of the Old Spallumcheen Road intersection at the west end of the existing bridge. The closure of the intersection will improve safety for users of the highway according to the ministry.

Regarding the change from five lanes to four, the ministry said this is to reduce the impact of the project on areasidentified as culturally or archaeologically sensitive, and will also allow the existing bridge to remain in service during construction of the new span.

The ministry anticipates construction of the bridge will take three years. Tree clearing and relocation of utilities are expected to be complete this year and the project is now expected to go to tender in 2022.

Along with information on project progress and next steps, the ministry released two videos which show a 3D rendering of the bridge and the off ramp and underpass which will be used to access Old Sicamous Road and Old Spallumcheen Road. The underpass was a feature of the five-lane design which is being carried over to the new plan.

According to the ministry, the project remains on-budget: $224.5 million in funding for the project was approved in 2018, with $91 million of the total coming from the federal government.

Mayor Terry Rysz says he thinks the ministry has made up their mind about the direction the bridge project will be taking but he wants to see some features added to it. Rysz said he wants to ensure ease of access for traffic off the highway into Sicamous’ downtown commercial areas, and easy access to the west side of the Sicamous channel.

In particular, Rysz said he and the rest of the Sicamous council would be lobbying the ministry for help in building an extension of Silver Sands Road allowing another access point for drivers to get off the highway and into town.

Since the second car bridge at Main Street was removed from the plans, Sicamous’ council has been seeking help for the construction of a pedestrian suspension bridge over the channel. Rysz said the ministry referred them to an active transportation grant program, but he estimated the cost of a suspension bridge at over $5 million and was unsure how much of the grant would cover. He said a pedestrian link across the Sicamous channel is essential to the District’s plans to serve as a gateway to the Sicamous to Armstrong Rail Trail which is under construction.

Read more:Single-bridge option chosen to replace RW Bruhn Bridge

Read more: Sicamous mayor addresses Main Street bridge misinformation

Read more: Main Street bridge won’t cost district

Read more: Opinions divided on bridge options

Read more: Public favours five-lane option to replace Bruhn Bridge

While the current plan for the highway bridge shows a walkway alongside the eastbound lane of the highway, Rysz said he has concerns about the safety of the walkway and how it will tie into the rail trail. The existing bridge has a walkway which is not separated from traffic by barricades as the one in the photo is. Two vehicle collisions in recent years have forced vehicles over the walkway only to be stopped by the bridge railing itself, damaging it in both cases.

Overall, whatever design is settled on, Rysz said it is clear that the existing highway bridge must be replaced as soon as possible.



jim.elliot@saobserver.net

Like us on Facebook and follow us on Twitter

infrastructure

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Machinery could be seen working to clear land behind a pair of houses on Main Street for the future site of the Shuswap and Secwepmc Healing Centre, a medical facility on Friday, April 9. The Sicamous Fire Department has been using the buildings for training exercises ahead of their demolition. (Jim Elliot/Eagle Valley News)
Snapshot: Clearing space

Land is being cleared for a new medical centre on Sicamous’ Main Street.

Winter driving conditions returned to the Coquihalla Highway on April 10. (ICBC image)
Coquihalla motorists warned of fresh snow

Five to 10 cm of snow is expected today for the mountain highway.

B.C's COVID-19 dashboard shows the peaks and valleys of cases prior to the record daily report of 132 on April 9, 2021. (Dashboard image)
Interior Health has record day of COVID-19 cases

132 cases reported Friday, April 9, more deaths in Vernon hospital outbreak

School District 83 trustees are leaning towards an option in the school district’s Long Range Facilities Plan that favours making Salmon Arm Secondary’s Sullivan campus and Jackson campus (pictured) both Grade 9-12 schools. (Google maps image)
Letter: Two high school option for Salmon Arm will create ‘have, have not’ situation

Writer concerned with E5 option, says transparent talk about implications needed

B.C. Health Minister Adrian Dix and Premier John Horgan describe vaccine rollout at the legislature, March 29, 2021. (B.C. government)
1,262 more COVID-19 infections in B.C. Friday, 9,574 active cases

Province’s mass vaccination reaches one million people

Two-year-old Ivy McLeod, seen here on April 9, 2021 with four-year-old sister Elena and mom Vanessa, was born with limb differences. The family, including husband/dad Sean McLeod, is looking for a family puppy that also has a limb difference. (Jenna Hauck/ Chilliwack Progress)
B.C. family looking for puppy with limb difference, just like 2-year-old Ivy

Ivy McLeod born as bilateral amputee, now her family wants to find ‘companion’ puppy for her

This illustration provided by the Centers for Disease Control and Prevention in January 2020 shows the 2019 Novel Coronavirus.[CDC]
More COVID-19 exposures reported at schools in Kelowna

Interior Health added additional schools and dates to their list of exposures

A vehicle that was driven through the wall of a parkade at Uptown Shopping Centre and into the nearby Walmart on April 9 was removed through another hole in the wall later that night. (Photo via Saanich Police Department and Ayush Kakkar)
Vehicle launched into B.C. Walmart removed following rescue of trapped workers

Crews cut new hole in parkade wall to remove vehicle safely

Four members with Divers for Cleaner Lakes and Oceans were out at Cultus Lake on March 28 and 29 hauling trash out of the waters. (Henry Wang)
PHOTOS: Out-of-town divers remove 100s of pounds of trash from Cultus Lake

Members of Divers for Cleaner Lakes and Oceans hauled out 470 pounds of trash over two days

As of Saturday, April 10, people born in 1961 are the latest to be eligible for a COVID-19 vaccine. (Black Press files)
B.C. residents age 60+ can now register to get their COVID-19 vaccine

Vaccine registration is now open to people born in 1961 or earlier

A new saline gargle test, made in B.C., will soon be replacing COVID-19 nasal swab tests for kids. (PHSA screenshot)
Take-home COVID-19 tests available for some B.C. students who fall ill at school

BC Children’s Hospital plans to provide 1,200 kits to Vancouver district schools this April

Sun Peaks is tracking rising COVID-19 cases. (Kamloops This Week Photo)
Sun Peaks sees spike in COVID-19 cases at end of ski season

On April 9, there were 15 positive cases confirmed.

Ruming Jiang and his dog Chiu Chiu are doing fine following a brush with hypothermia that saw several people work together to get them out of the Fraser River near Langley’s Derby Reach Park on March 25, 2021 (Special to the Advance Times)
Man finds men who rescued him from drowning in B.C.’s Fraser River

A grateful Ruming Jiang says he will thank them again, this time in person when the pandemic ends

Most Read